Case Study · Fisheries · Weir Block

Washington Dept. of Fish & Wildlife — Sol Duc Temporary Weir

Temporary weir on the Sol Duc River for the Washington Department of Fish & Wildlife — Texas Tuff Rock Bags placed as the weir block for stream flow management at the fishery, installed late September 2023 through mid-November 2023.

Washington DFW temporary weir at Sol Duc built with rock bags
Location
Sol Duc River, Washington
Year
2023
Application
Fisheries · Weir Block
Project Overview

Project overview copy is being finalized by the FES engineering team. Use the gallery below to see the work in place. Reach out for sizing, lead time, and pricing within one business day.

Gallery

On site

Washington DFW temporary weir at Sol Duc built with rock bags — photo 2
Washington DFW temporary weir at Sol Duc built with rock bags — photo 3
Washington DFW temporary weir at Sol Duc built with rock bags — photo 4
Washington DFW temporary weir at Sol Duc built with rock bags — photo 5

Working on a similar project?

Tell us the site conditions and we'll come back with sizing, lead time, and pricing within one business day.