FES Solutions makes and supplies Texas Tuff Rock Bags. We do not install them. The bags ship empty, are filled on site with local stone, and are then lifted by a single lifting point and set in place by a machine. Whoever does that work is your installer, and you or your project team hire them.
On a residential bank that is usually a local excavation, landscape or marine contractor with a compact machine. On larger sizes and public works it is usually a civil or marine contractor. Offshore and subsea placement is crane or vessel work. This page covers who to call, what to send them, what to ask before they start, who owns the permit and the design, and when a different kind of contractor is the better answer.
Who usually places rock bags
The machine decides who can do the job, and the bag size decides the machine. The placement plant below is the same as on the sizing guide.
| Bag size | Typical placement plant | Who usually does the work |
|---|---|---|
| 1-Ton | Compact excavator or skid steer | A local excavation, landscape or marine contractor |
| 2-Ton | Mid-range excavator | A civil, excavation or marine contractor |
| 4-Ton | Heavy-civil equipment | A heavy-civil or marine contractor |
| 8-Ton | Crane or vessel | A marine contractor with lifting plant on the water |
Experience with rock bags helps, but the things that matter most can be checked before anyone starts: a machine that can lift a filled bag at the reach the job needs, a crew that can fill and rig units without twisting the rope, and the discipline to place the toe first and finish the ends properly.
Where the work is beyond reach from the bank, the job moves onto the water. Barge and vessel-based placement and underwater placement cover what changes.
Can you place them yourself?
Usually not, even at the smallest size. A filled 1-Ton bag weighs about a tonne and has to be lifted and set by machine, often at the edge of ground that is already failing. Most owners hire a local contractor who brings the machine and sources the fill stone.
Do-it-yourself work still has a place above the water and on gentle, sheltered slopes: planting, regrading, sorting out drainage behind the bank. What sandbags and DIY fixes can’t do sets out where it helps and where it washes out.
When a different contractor is the better answer
Rock bags armor a bank or bed against moving water. They do not hold back a bank that is failing as a mass, and they do not create a vertical face. Some sites need a different kind of contractor, and often an engineer first:
- Tension cracks behind the crest, arc-shaped scarps, or movement that carries on in dry weather. Those point to a stability failure. Get a geotechnical opinion before anyone places armor. How to read a failing bank explains the difference.
- You need a vertical face, to keep usable land at the water, to hold a road or building above the bank, or to form a quay. That is a retaining structure designed by an engineer and built by a contractor who does that work. Rock bags vs. sheet pile sets out where retention is the right answer.
- The problem is drainage from behind the bank, not the water in front of it. That is often cheaper, and easier to permit, than armor.
When not to use rock bags lists the other cases where we would steer you elsewhere.
What to hand your installer
A contractor can only price and plan what they are given. Before you ask for a price, send them:
- The FES quote: the bag size, the quantity and the layout approach. See what a quote includes.
- The installation guide, which covers aggregate approval, filling, closure, lift planning, placement on land and under water, and inspection.
- Photographs of the bank from the water, from the top, and of the access route.
- The extent: the length to protect, how high the protection goes, and the water depth at the toe.
- The stone requirement. Fill stone must be larger than the mesh opening in every direction: 25 mm on the 1, 2 and 4-Ton and 50 mm on the 8-Ton. The stone is not in the FES price. See fill stone selection.
- The delivery date and who unloads. The bags arrive flat on pallets. Who unloads depends on the freight terms on the quote.
- The permit and its conditions, if you have one: work window, material restrictions, turbidity control.
- Any drawings or a scour report from your engineer.
Questions to ask before they start
Ask every contractor the same questions and compare the answers, not just the totals.
Equipment and reach
- Which machine will you bring, and what can it lift at the reach to the farthest bag, with the rigging? Check the load chart at that distance, not the machine’s headline rating. See equipment selection by bag size.
- Where will the machine stand, and is that ground strong enough near the bank edge?
- How will the bags be filled: is there a filling frame or hopper to hold each bag open?
Stone, delivery and staging
- Where will the fill stone come from, and does it clear the mesh-size requirement?
- Who unloads the pallets, and with what?
- Where will the stone pile, the empty bags and the filling area go? See site access and staging.
- Will you contact 811 before any digging? 811 is the free national before-you-dig service that has the approximate location of buried utility lines marked.
The work itself
- Will you place the toe row first and carry the protection past the damaged area into stable ground at both ends? See placement sequence and coverage.
- Will you lift filled bags rather than drag them, and fill them without dropping stone from height?
- Will you photograph the work and record how many bags went where? That record is the baseline for every later inspection.
Price and paperwork
- What exactly does your price include: fill stone, plant days, crew, access, environmental controls, survey? A price with no stone line or no plant days is not complete. Supply-only vs. installed pricing lists everything that sits between the bag price and a finished job.
- What happens to the price if more bags are needed than the estimate?
- Can you show proof of insurance before you mobilize?
- Who is applying for the permit, and who checks the work against its conditions?
Permits, insurance and design: who owns what
Agree this in writing before work starts.
The permit. In-water work is regulated because of the water, not the size of the job. Discharging dredged or fill material into navigable waters can require a permit under Section 404 of the Clean Water Act, and building a bulkhead or similar structure in navigable water, or altering it, can require authorization under Section 10 of the Rivers and Harbors Act. Whether your work needs either, and on what terms, is decided by the U.S. Army Corps of Engineers district covering your site and by your state agency, not by a contractor or a supplier. The Corps’ regulatory office map shows which district covers a location. On a private bank, an engineer or permit consultant often prepares the application. Whoever files it, the conditions attached to an authorization are enforceable, so make sure your installer has read them and works to them. Do you need a permit to fix erosion on your shoreline? walks through the process.
Insurance. Ask the contractor for proof of their insurance before they bring a machine onto your property, and ask your own insurer whether your policy has anything to say about contractors working there. Neither FES nor this page can tell you what cover is enough for your job.
Design. FES is a supplier, not the engineer of record, and provides no service that needs a P.E. stamp. Our sizing is a starting point for discussion. On anything beyond a simple bank repair, and on any public project, the design belongs to an engineer, and the installer builds to that design.
Warning signs
- A price that does not mention fill stone, plant or access, so the real cost is still to come.
- An offer to skip the permit, or to “sort it out afterwards”.
- No plan for the ends of the protection, or for the toe.
- Bags dragged into place, or stone dropped into them from height.
- No answer to “what can your machine lift at that reach?”
- Pressure to start before the stone source has been checked against the mesh size.
What FES does, and does not do
What FES does: sizes the bags for the conditions you describe, gives a quantity and a layout approach, prices the product with lead time and shipping, supplies the documentation for a submittal, and publishes the installation guide your installer works from. There is no charge for that engineering help, including at concept stage.
What FES does not do: install, supply plant or crew, act as the engineer of record, stamp drawings, or prepare permit applications.
Get sizing to hand your installer
Send photographs, the rough extent and how a machine can reach the bank through the quote form, or call +1 512-766-6608. What comes back is a size, a quantity and a layout approach you can give your installer to price against.
Where to go next
- What a quote includes for exactly what comes back
- Supply-only vs. installed pricing for the costs that sit with the installer
- Site assessment before you order for what to measure
- Installing 1-ton rock bags for a small residential job, step by step
- Civil and marine contractors if you are the installer
- The rock bag buying guide for the whole path from an eroding bank to an order