Permitting and Agency Approvals

Permitting in-water work: who has to say yes, and in what order.

Work below the ordinary high water mark is regulated whoever you are and whatever you place. The approvals are usually predictable, the sequencing is not, and the in-water work window is the constraint that most often decides the construction date.

This hub covers the federal and state approvals that recur on erosion and scour projects, what an agency reviewer looks for when the proposed material is not on a standard list, and what happens when a repair is urgent and the permitting is not. None of it is legal advice, and the requirements vary by district.

Articles

Documentation

Assembling the submittal package

A checklist for the documents a permit application and a materials submittal actually need, and the four items most often missing when a package is returned.

5 min read Read
Documentation

Construction stormwater permitting

Separate from the permit to build the thing: authorisation for the disturbance of building it. Triggered by disturbed area, and it requires a SWPPP and inspections.

5 min read Read
Field Notes

Emergency permitting when work cannot wait

Emergency provisions are a faster path with their own requirements and a follow-up obligation, not a way around the process. Establish which one applies before the event.

5 min read Read
Documentation

Endangered Species Act consultation

Not a permit, but a permit cannot issue until it is resolved. Consultation is the most common reason a routine bank repair takes a year instead of a season.

5 min read Read
Documentation

Floodplain permitting and no-rise

Armor in a regulatory floodway has to be shown not to raise the base flood elevation. That certification is a hydraulic analysis, and it constrains how far protection can project.

4 min read Read
Documentation

In-water work windows

The window, not the permit, usually sets the construction date. Miss it and you wait a year, so placement rate becomes a selection criterion rather than a preference.

5 min read Read
Documentation

Nationwide Permit 13 and bank stabilization

NWP 13 is the general permit most erosion repairs aim for. Its limits change at each reissuance, so design to the current text rather than to what you remember.

5 min read Read
Documentation

Getting a non-standard product approved

Agency specifications are written around a materials list. A product not on it is not prohibited, it is unaddressed, and the route through is a documented equivalency case.

5 min read Read
Documentation

Permitting in-water erosion work

Work below the ordinary high water mark is regulated whoever you are. The approvals are predictable; the sequencing and the work window are what decide your schedule.

5 min read Read
Documentation

Section 10 of the Rivers and Harbors Act

On a navigable water, Section 10 applies on top of Section 404. It protects navigation rather than water quality, and it catches work that places no fill at all.

5 min read Read
Documentation

Section 404 of the Clean Water Act

Armor placed on a bed or bank is fill. Section 404 regulates it, the Corps administers it, and the sequence you have to demonstrate is avoid, minimise, mitigate.

5 min read Read
Documentation

State coastal zone approvals

In a coastal state, a federal permit needs a consistency determination from the state coastal program. Many of those programs now prefer sloped protection to new vertical walls.

5 min read Read
Documentation

What an agency reviewer wants to see

A reviewer is looking for reasons to be comfortable approving. Show the problem, the alternatives considered, the minimisation, and the limits you already know about.

5 min read Read
From the answer bank

26 questions on permitting, answered.

Part of the full rock bag FAQ. Each question below opens at its answer.

Regulatory Approvals and Agency Requirements

Permitting and Environmental Planning

FES Solutions is a supplier, not the engineer of record. This article is general engineering background, not a site-specific design. Conditions vary, and the design decision for your project belongs to the engineer of record. Where rock bags are not the right answer.

Working on a project like this?

Send the site conditions and the engineering team will come back with sizing, lead time, and pricing within one business day. For storm and flood emergencies, call directly.