Erosion control vs. sediment control

FES Solutions 4 min read
On this page

“Erosion and sediment control” appears as one phrase on plans, in specifications, and in permit conditions, and the two halves get treated as interchangeable. They are not, and the difference is a hierarchy rather than a taxonomy.

The distinction

Erosion control prevents soil particles from detaching in the first place. It works on the source.

Examples: surface cover, mulch, erosion control blankets, temporary and permanent seeding, turf reinforcement mats, surface roughening, phasing to minimise the area exposed at once, minimising the duration of exposure, and diverting clean water around disturbed areas so it never runs over bare soil.

Sediment control captures soil that has already detached and is being transported. It works on the consequence.

Examples: silt fence, sediment traps and basins, check dams, inlet protection, stabilised construction entrances, and turbidity curtains.

Why the hierarchy matters

Soil that never detaches does not have to be caught, does not settle in a basin you then have to clean out, and does not escape when a control is overwhelmed.

Sediment controls are also, on their own, not very efficient. A silt fence intercepts sheet flow and lets water pass while retaining coarser particles — it does comparatively little for the fine fraction, which is the fraction that causes the turbidity a permit condition is usually written about. A sediment basin needs residence time, and fine particles may not settle within it.

So a plan that leaves large areas bare and relies on a perimeter of silt fence has accepted the erosion and is trying to catch it with the less effective half of the toolkit.

Erosion control first, sediment control as the backstop. That is the sequence, and it is what a reviewer looks for.

Where the phrase misleads on an armor project

This is where the vocabulary causes practical confusion.

A rock bag, a riprap blanket, or a block mat is permanent works. It is armor resisting hydraulic attack on a bed or bank for the life of the asset. It is not a construction-phase control and it is not a sediment control device.

Conversely, a rock filter bag or silt bag used in a stormwater application to filter sediment out of a discharge is a sediment control product, and it is a different thing entirely despite the similar name.

The two get conflated because the vocabulary overlaps. If a specification or a plan is unclear which is meant, it is worth resolving explicitly, because the products, the duty, and the design life are all different.

What each does on an armor project

An armor installation involves both, in different roles.

During construction, you need erosion and sediment control for the disturbance you are creating: access tracks, staging, stockpiles, the disturbed bank, and the in-water work. This is the construction stormwater permitting domain, and the specific concern on in-water work is turbidity.

After construction, the armor is doing something else: resisting the hydraulic attack that was eroding the bank in the first place. That is erosion prevention in the broad sense — it stops material detaching — but it is permanent works and it is designed and specified as such.

The in-water version

On bank and bed work, the receptor is a few feet away, so the controls differ from a typical land development site:

Erosion control means minimising what you disturb: placing units into existing geometry rather than grading a bed flat, avoiding dewatering, stabilising disturbed areas promptly, and keeping stockpiles away from the water.

Sediment control means turbidity curtains or silt barriers isolating the work area, and monitoring against whatever numeric limits the permit carries.

Turbidity conditions usually arrive through the state water quality certification rather than the stormwater permit — see Section 404.

Reading a plan critically

Useful questions:

  1. What proportion of the plan is erosion control versus sediment control? Heavy on the latter suggests the hierarchy was not applied.
  2. How large an area is exposed at once, and for how long? Phasing is an erosion control and it is free.
  3. Is clean water diverted around disturbed areas?
  4. What happens to stockpiles?
  5. Is there a stabilisation deadline after work in an area finishes?
  6. What is the inspection regime, and who does it? Controls that are not maintained do not work, and this is where sites most commonly fail.
  7. On in-water work, what are the turbidity limits and how are they monitored?

The permanent transition

The step most often mishandled: moving from construction controls to permanent stabilisation.

Temporary controls come out. Something permanent has to be in place first — established vegetation, permanent armor, or a permanent cover. Removing a silt fence from a slope that has not vegetated leaves a bare slope with no control at all.

On an armor project the permanent works is the armor, and above it usually vegetation, which needs time to establish. Sequencing the removal of temporary controls after establishment rather than after substantial completion is the detail that gets missed.

Where to go next

FES Solutions is a supplier, not the engineer of record. This article is general engineering background, not a site-specific design. Conditions vary, and the design decision for your project belongs to the engineer of record. Where rock bags are not the right answer.

Written by
FES Solutions
Engineering team

Written from FES Solutions' project experience — makers of the Texas Tuff Rock Bag™.