Ships have grown and so has installed power. A berth designed for the vessels of thirty years ago can now take far more energy on its bed every time a ship arrives or leaves, from main propellers, bow and stern thrusters, and podded drives. The result is scour at the toe of quay walls, around the piles of open jetties, and at the edges of any protection already there. We describe the mechanism in scour at marine piles and dolphins and scour at bulkhead and sheet pile toes.
The main reference is PIANC’s MarCom Working Group 180 report, Guidelines for protecting berthing structures from scour caused by ships (2015), which PIANC describes as providing “practical guidelines and detailed background information about vessel propulsion” so a designer can design the quay structure and the bed in front of it. The earlier PIANC WG 22 report (1997) is still cited alongside it in design papers.
This list ranks the ways to protect a berth in the order they should be addressed. It is written for port engineers, terminal operators and marine contractors.
1. Get the design loads right
Every protection method depends on the bed velocity it has to resist, and that comes from the vessels. PIANC WG 180 sets out a framework to determine the efflux velocity from propulsors, the velocity distribution in the jet, and the velocity at the bed. It deals in particular with the very high velocities from propellers, podded propulsors and water jets. It does not cover contra-rotating propellers, and it does not cover thruster-driven abrasion from sandy bed material or floating ice.
Three inputs are most often missed:
- The design vessel over the life of the berth, not the vessel calling today. Hawkswood and co-authors (PIANC-COPEDEC 2016) stress that design vessels for the future life of a berth should be chosen carefully.
- Rudder deflection. Early testing by Fuehrer and Römisch (1977) showed that a central rudder splits the propeller flow and significantly changes the bed velocity. PIANC WG 22 advised allowing for rudder deployment at berths, and the 2016 paper notes that even where tugs assist, the main propeller can still be used with any rudder angle.
- Twin propellers. Ferries, cruise ships and some large container ships have twin propellers and may “crab” onto a berth with one ahead and one astern. Hawkswood and Groom (PIANC 2018) extended the single-propeller design methods to twin propellers from scale model tests and recommend designers take this into account.
Do it first: collect vessel classes, installed power, propeller and thruster geometry, keel clearance and berthing practice before any protection is drawn.
2. Decide: allow scour or protect against it
PIANC WG 180 frames two design philosophies: allow scour and design the structure for it, or protect the quay against erosion with riprap or mattresses. Allowing scour means designing the wall or piles for the predicted scour depth with margin, plus a monitoring and maintenance plan. It can suit new build where deeper embedment is cheap, and softer loading regimes.
Scour depth prediction is uncertain. The 2016 Hawkswood paper argues the WG 180 approach overestimates scour depth in fine-grained soils and calls for more field data from working harbors. Either way, the decision should be explicit.
Best for: new structures where extra embedment is cheap. An existing quay’s embedment is fixed, so it usually has to be protected instead.
3. Operational controls
Restricting thruster power near the berth, requiring tug assistance for certain classes, or changing the approach can reduce the load on the bed. The 2016 paper lists tug use and captains’ behavior among the factors that decide the probability of a design event, and notes that some ports do have policies to handle vessels using tugs.
Operational measures are cheap to build and hard to enforce, and they do not remove the main propeller from the picture. They are best used to buy time or to trim an otherwise heavy protection design, not as the only line of defense.
Best for: existing berths awaiting capital work, and as a complement to physical protection.
4. Rock protection (riprap on a filter)
Rock is the traditional berth protection: typically two layers of armor stone on a bedding or filter layer, often over a geotextile. WG 180 bases its riprap design on established guidance, naming the BAW (German Federal Waterways Engineering and Research Institute) method, the EAU recommendations for waterfront structures, and the Rock Manual.
The limit is size. The 2016 paper notes that with increasing propeller action, larger rock has become impractical and less cost-effective, that at vertical quay walls the construction depth of the rock layer significantly affects the height the wall must span, and that at open piled quays WG 180 gives larger rock to allow for slope and pile effects, which is increasingly difficult to place.
Best for: moderate loading, open piled quays where the slope is already rock, and sites where suitable stone is available.
Watch for: stone size beyond what a quarry produces, and loss of berth depth to the rock layer thickness.
5. In-situ concrete mattresses
Fabric formwork laid on the bed and pumped full of concrete or grout forms a thin, continuous slab that follows the bed profile as placed. At vertical quay walls, thinner protection types such as these are often preferred over rock because they take less depth. The 2018 Hawkswood and Groom paper argues that significant savings can be made to piled and gravity walls using thinner mattress construction, and that in-situ concrete mattress with a rock falling edge apron is often a beneficial combination, including for berth deepening at existing walls.
The key design choice is whether the protection is “sealed” against flow entering beneath it at joints and edges. The 2016 paper lists the principal failure modes as uplift of panels and underscour at the edges, and notes that trapped flow pressure under a protection is much greater than the suction from propeller flow over it.
Best for: vertical quay walls, berth deepening, and high propeller loads where rock would be too large.
Watch for: edge and joint detailing, and quality control of work done underwater.
6. Prefabricated mattresses (block mats and similar)
Concrete block mattresses, asphalt mattresses and gabion or reno mattresses are placed as prefabricated units. The 2016 paper lists joint failure, unit movement and edge underscour as their principal failure modes. Deltares tested loose rock and block mattresses under bow-thruster and propeller jets and found that placement accuracy is critical to block mat stability, and that existing guidelines are not always applicable to block mattresses.
Best for: sites with good placement control and a suitable bed.
Watch for: placement tolerance, joints, and edges, which are where they fail.
7. Falling edge aprons at the perimeter
Whatever covers the main berth pocket, its edges are where scour attacks next. A rock falling apron is a strip of loose rock laid in a trench at the perimeter. When scour lowers the bed at the edge, the rock rolls down and armors the new slope. The 2016 paper reports scale model tests and deployed aprons in service, says they are increasingly used as edge protection to mattress and in-situ concrete, and proposes initial guidance, including sizing the rock quantity for at least one layer of armor on the deployed slope down to the required protection level. It also recommends monitoring so that aprons can be topped up before they are fully deployed.
Best for: the edges of any mattress or concrete protection, and the ends of a berth where vessels swing.
8. Bagged rock and filter units for irregular areas and repairs
Rock-filled mesh bags or filter units are placed one at a time by crane or excavator from the quay or a barge. They suit the places a continuous system handles badly: around individual piles, under fender systems, against an existing quay face, filling an existing scour hole, and patch repairs that have to fit between vessel calls. Filter units have been studied as a countermeasure to jet-induced scour in front of quay walls, for example in a 2011 Coastal Engineering Journal paper combining 3D numerical modeling with filter units.
FES rock bags were used on port works in New Zealand in 2024, including berth scour protection. The design question for any bagged unit is the same as for rock: the bed velocity under the design vessel, and whether each unit is heavy enough for it. Where published stability data does not cover the load, rock or mattress protection designed to WG 180 is the safer route.
Best for: irregular geometry, repairs, and interim protection.
Watch for: unit weight against the design jet velocity, and gaps between units at the quay face.
9. Survey, monitor, maintain
Propeller scour is repeatable: the same vessel classes berth the same way, so the jets hit the same places. Repeat multibeam surveys against a baseline reveal the pattern within a few surveys, and they are how falling aprons are checked before they run out of rock. Construction underwater also needs its own quality control. The 2016 paper notes that divers generally cannot work effectively in currents above about 0.5 m/s, where automated placement from plant is preferred.
Build the survey interval and trigger levels into the design, not the maintenance budget.
Quick guide
| Situation | Usual answer |
|---|---|
| New berth, cheap extra embedment | Allow scour, design for it, monitor |
| Existing vertical quay wall, high thruster loads | In-situ concrete mattress with falling edge apron |
| Open piled quay on a rock slope | Rock protection designed to WG 180 |
| Moderate loads, stone available | Riprap on a filter |
| Around piles, under fenders, existing holes | Bagged units or grout, with a designed edge |
| Awaiting capital work | Operational controls and surveys |
For more on the application, see marine and ports, toe protection, and our ranked list of alternatives to riprap for scour protection.