Offshore wind cables fail more often than anyone would like, and the failures are expensive. When the Carbon Trust’s Offshore Wind Accelerator published its Cable Burial Risk Assessment guidance in 2015, it cited figures from the specialist underwriter GCube: over 80 percent of offshore wind construction projects had resulted in a cable-related incident, and cumulative costs to insurers between 2007 and 2014 were £75 million.
This list ranks the ways cables are protected, in roughly the order a project should consider them. The first methods avoid or remove the hazard. The later ones are what you use where the first ones fall short. It is written for developers, cable engineers and marine contractors, and it covers static export and inter-array cables in shallow water, the scope of DNV’s recommended practice DNV-RP-0360, Subsea power cables in shallow water. The companion standard for wind is DNV-ST-0359, Subsea power cables for wind power plants.
A U.S. reference point: the BOEM fact sheet for the Atlantic Shores construction activities gives a target burial depth of 5 to 6.6 feet (1.5 to 2 m), installation by jet plowing or trenching, mechanical plowing, or free-lay with post-lay burial, and lists “rock armor, rock bags, concrete mattresses, and protective half-shells” as the protection options under consideration. That is a fair summary of the toolkit.
1. Route engineering: avoid the hazard
The cheapest protection is a route that does not need it. Route selection decides how much of the cable can be buried, how many crossings there are, and how much of it sits in sand waves, on boulders or in an anchorage.
A report prepared for BOEM, Offshore Electrical Cable Burial for Wind Farms (Sharples, 2011), treats sand waves as a routing problem first: a cable buried in a migrating sand wave field can be uncovered as the crests move, so the ideal is burial below the troughs, and where that is not possible, repeated inspection and remediation. The same report advises finding the most likely location of an emergency anchor drop and routing away from it where possible. The Carbon Trust has also published guidance on geophysical surveys for unexploded ordnance and boulders, the two hazards that most often force a reroute or clearance campaign.
Use it for: every project, before anything else is specified.
2. Burial to a risk-based depth
Burial is the primary protection for most offshore wind cable length. The question is how deep. The Carbon Trust CBRA guidance replaced a single blanket number with a probabilistic assessment of the actual threats along the route (anchors, fishing gear, seabed mobility) against soil conditions, to set a depth of lowering and then estimate the risk that remains after burial.
The BOEM report’s summary of practice is a useful sanity check: about 1 to 2 m (3 to 6 ft) in most areas, depending on cable design and site conditions, and about 4.5 m (15 ft) in anchorage areas or busy channels where a ship might deploy an anchor. It adds that softer sands where trawl gear penetrates need deeper burial, and stiff clays allow shallower burial.
Tools include jetting (fluidizing the soil so the cable sinks), plowing (cutting a trench and laying in one pass) and mechanical trenching for harder ground. The tool that suits the soil is the one that achieves the target depth, and the depth achieved is what the rest of this list has to make up for where it falls short.
Use it for: the bulk of export and inter-array cable length on soft to medium seabed.
3. Horizontal directional drilling at the landfall
At the shore crossing, cables are commonly pulled through ducts installed by horizontal directional drilling (HDD) under the beach, dunes and nearshore zone. That keeps the cable out of the surf zone, where waves, longshore transport and beach change would otherwise expose it, and it avoids open trenching through sensitive coastal habitat. The BOEM report covers HDD among the techniques for burial near the coast.
The exit point offshore is where the risk moves. It needs its own burial or protection detail, because the transition from duct to seabed is a common place for exposure.
Use it for: landfalls, and crossings of dunes, seawalls or coastal infrastructure.
4. Rock placement where burial is not achieved
Where the seabed is too hard to bury into, where burial falls short of the target, or at crossings of existing cables and pipelines, rock is placed over the cable to form a berm. On large volumes it is placed by fall-pipe vessel, with an ROV steering the discharge. The BOEM report notes rock berms for rocky areas and cautions that the rock “must be carefully selected and sized to be appropriate for the job”, and that placement itself must not damage the cable.
Rock berms have the advantage of loose rock: they settle with the bed and can be topped up. The cost is driven by the vessel, so a long berm is efficient and a single short one is not. We cover that economy of scale in rock bags vs. fall-pipe rock dumping.
Use it for: hard ground, shortfall in burial depth over significant lengths, and crossings.
5. Cable protection systems and scour protection at the foundation
The most exposed length of an inter-array cable is where it leaves the seabed and enters the turbine foundation. It is unburied, it may be free spanning over a scour hole, and it is subject to bending where it meets steel. Cable protection systems (CPS), typically combining bend restrictors, a bend stiffener and an interface device that latches into the monopile entry, are now standard for this length. Suppliers include Tekmar and Balmoral.
A CPS depends on the scour protection around the foundation. The BOEM report records scour at wind turbine sites in granular soil and high current, citing Scroby Sands and Prinses Amalia, extending to around 5 m deep and 60 m across, enough to expose the cable. It recommends that the J-tube or cable exit be placed below the zone that may scour, or far enough out that scour protection can be placed. Foundation scour protection is usually a rock filter and armor layer, placed before or after the pile.
Use it for: every cable entry at every foundation, together with the scour design for that foundation.
6. Concrete mattresses at crossings and short lengths
Concrete mattresses are the standard product at cable and pipeline crossings, where a separation layer is needed between the two assets and defined cover over the top. They are also used over short unburied lengths and as scour protection near structures. The BOEM report illustrates mattresses in both roles.
Their strength is predictable, uniform cover. Their weakness is an uneven seabed, where a mattress can bridge high points and leave voids beneath. We cover that in rock bags vs. concrete mattresses.
Use it for: crossings with a standard design, and short lengths on a flat, surveyed seabed.
7. Articulated half shells and polyurethane sleeves
Articulated cast-iron or ductile-iron half shells, and polyurethane sleeves, are clamped around the cable itself. They add weight, resist abrasion and impact, and limit bending. They are the usual answer at rocky shore ends, where a cable crosses hard ground it cannot be buried in, and on the short length near a foundation. The BOEM report notes that plastic coverings “are usually used in conjunction with other protective measures such as rock covering.”
They protect the cable, not the seabed. On a mobile bed they are paired with rock, bags or mattresses.
Use it for: rocky and abrasive seabed, shore ends, short sections where burial is not possible.
8. Bagged rock for targeted and remedial protection
Rock-filled mesh bags (and the similar filter units used in Japan) are lowered one at a time by crane and land where they are placed. They are used at crossings, free spans, cable exits and exposed spots found on inspection surveys, where a fall-pipe campaign would be out of proportion to the scope. BOEM’s Atlantic Shores fact sheet lists rock bags among the options under consideration. The mechanism they address, a cable or pipe scouring itself a span on a mobile seabed, is described in subsea free spans and seabed scour.
We manufacture one of these products, and we have not supplied an offshore wind farm; our offshore work is subsea pipeline and cable protection, and our offshore wind page is written as capability, not track record. For how bagged units compare with the other systems in this list, see the best subsea cable and pipeline protection solutions.
Use it for: small, targeted scopes, crossings with awkward geometry, and remedial work after survey.
The step that makes the others work: inspection and remediation
None of the methods above is fit and forget. The BOEM report stresses the post-installation survey and a plan for in-service inspection and repair, and gives a cautionary example: a section of export cable that had been rock protected because it did not reach target depth in a hard seabed was then eroded by current interacting with holes left by the installation vessel’s spud cans. It would not have been found without a survey.
Plan the as-laid survey, the in-service survey interval and the remediation method before the cable is laid. Mobile seabed, sand waves and scour around foundations change over the life of the field, and so does the protection that is needed.
Quick guide
- Most of the route, soft to medium seabed: risk-based burial (CBRA), after good route engineering.
- Landfall: HDD, with a designed exit detail.
- Hard ground or burial shortfall over long lengths: fall-pipe rock berm.
- Foundation entry: CPS plus designed foundation scour protection.
- Crossings: mattresses, rock or both, to a crossing agreement with the other asset owner.
- Rocky shore ends and short hard sections: half shells or polyurethane sleeves.
- A few exposed spots after survey: targeted rock, bags or mattresses from a general vessel.
For how combined wave and current loading affects any armor on the seabed, see combined wave and current loading.