Skip to main content
Storm-season scour checklist
FES Solutions — Texas Tuff Rock Bags
Engineering

When a 1-ton rock bag is not enough

Mike Jones 3 min read
On this page

A 1-ton rock bag is not enough when the water attacking the bank is stronger than the 1-Ton is rated for, when the problem is a sliding slope rather than erosion, or when the site is a structure a public agency owns. In the first case, step up to the 2-Ton or 4-Ton. In the other two, the job needs a different solution or an engineer first.

Signs the water is too strong for a 1-Ton

  • Long open water in front of the bank. Wind blowing across a wide lake or bay builds bigger waves than on a pond.
  • Steady boat traffic close to shore. Wake hits the bank all season, and large wake boats push more water.
  • A creek that rises fast and deep. If a flood fills the channel quickly and runs hard, the water at the toe is moving faster than it looks on a normal day.
  • The outside of a sharp bend. The fastest water hits here. See outer bend erosion.
  • Past repairs washed away quickly. If boulders, broken concrete, or riprap moved in one season, the site is telling you how strong the water is.
  • Deep water at the toe. Bags that sit low in a deep channel see more force.

Any one of these is a reason to check the size against the sizing calculator or send photos to FES before ordering. Published flow ratings for every size are on the specifications page.

Signs it is not an erosion problem at all

Rock bags armor the surface of a bank. They do not hold up a slope that is failing deeper down.

  • Cracks in the ground well back from the edge, running parallel to the bank.
  • A slope that has dropped as a block, with a step or scarp at the top.
  • Trees or fence posts tilting back toward the land, not toward the water.
  • Wet seeps or springs coming out of the bank face.

These point to a soil-stability or drainage problem. A geotechnical engineer should look at it first. Armor may still be part of the fix, but it will not be all of it. See how to read a failing bank.

Signs you need an engineer and an agency

  • A bridge, culvert, or road embankment owned by a city, county, or state. That work needs an engineered design and usually agency approval. See bridges and roads and rail.
  • Work in a regulated waterway. Most work in rivers, lakes, and tidal water needs a permit. See permitting in-water erosion work.
  • A bank that protects a house, septic system, or utility line. The cost of getting it wrong is high enough to justify a design.

Signs a different product fits better

The full list

FES publishes where rock bags in general are the wrong answer: when not to use rock bags. It is worth reading before any order.

Next step

If your site still fits the 1-Ton, see how many 1-ton rock bags you need. If it does not, send photos through the quote form and say what you are seeing. FES engineering will tell you which size, or whether rock bags fit at all. The 1-Ton Rock Bag page has the full specifications.

FES Solutions is a supplier, not the engineer of record. This article is general engineering background, not a site-specific design. Conditions vary, and the design decision for your project belongs to the engineer of record. Where rock bags are not the right answer.

Written by
Mike Jones
Engineering Manager, FES Solutions

Mike Jones is Engineering Manager at FES Solutions. He holds a BS in civil engineering and an MS in hydrology, and spent 15 years with engineering firms and as an independent consultant on drainage and erosion control projects.

Specifying scour protection?

Tell us the site conditions and we'll come back with sizing, lead time, and pricing within one business day.

Call