To order 1-Ton Texas Tuff Rock Bags, send FES your site details through the quote form or call +1 512-766-6608. FES engineering confirms the size and quantity, then quotes the bags and the freight to your address. The bags ship empty and flat on pallets. Stock is held in multiple warehouses, so direct shipment is typically under a week. You or your contractor fill them on site with local stone.
Why there is no price online
The right number of bags, and sometimes the right size, depends on the site. Freight depends on quantity and destination. A price per bag on a web page would leave out most of what the job costs. FES quotes each order instead. See what shoreline erosion repair costs, what drives the cost of a rock bag project, and supply-only vs. installed pricing.
There is no fixed minimum order. Very small orders carry more freight per bag, so ask rather than assume a job is too small to quote.
What to send with your request
The more of this you include, the fewer emails it takes:
- Location: the delivery address or nearest town, and the ZIP code
- What is happening: creek bank, pond or lake bank, drainage outlet, or scour around a structure
- Size of the area: the length of bank, and how high the protection needs to go
- Photos: from the water if you can, from the top of the bank, and of the access route
- The water: normal depth at the toe, and what it does in a flood or storm
- Access: the machine that can reach the bank, and any limits such as gate width or soft ground
- Timing: when the work needs to happen. Emergency, within a month, or planning ahead.
- Permits: whether a permit is in hand, applied for, or not yet looked at
If you have already counted bags with FES’s coverage method, include your count. Engineering will check it.
What comes back
- The recommended size, 1-Ton or a step up, with the reason
- The recommended quantity
- Pricing for the bags and the freight to your site
See what a quote includes for the full list.
Delivery
- Bags arrive flat on pallets, so freight reflects fabric and rope, not filled tonnage.
- Check who unloads. That depends on the freight terms on your quote. You may need a forklift, telehandler, or the contractor’s machine on site.
- Check the pallets on arrival: count, labels, packaging, and any damage to the mesh or ropes.
- Store the pallets flat, covered, and out of standing water and direct sun until they are used.
Before the bags arrive
- Line up the contractor and the machine. See installing 1-ton rock bags.
- Order the fill stone. It has to be larger than the 25 mm mesh opening. See fill stone selection.
- Sort out the permit. Most work in rivers, lakes, and tidal water needs one. See do you need a permit to fix erosion on your shoreline?
- Photograph the bank before work starts. It helps with permits, insurance, and any cost-share program.
If it is an emergency
If a bank is failing now, call rather than use the form: +1 512-766-6608. See what to send with an emergency request.
Get the quote
Request a quote on the 1-Ton, or see the 1-Ton Rock Bag specifications first.