Skip to main content
FES Solutions — Texas Tuff Rock Bags
Case Study · Fisheries · Weir Block

Washington Dept. of Fish & Wildlife — Sol Duc Temporary Weir

Temporary weir on the Sol Duc River for the Washington Department of Fish & Wildlife — Texas Tuff Rock Bags placed as the weir block for stream flow management at the fishery, installed late September 2023 through mid-November 2023.

Washington DFW temporary weir at Sol Duc built with rock bags
Location
Sol Duc River, Washington
Year
2023
Application
Fisheries · Weir Block
Gallery

On site

Washington DFW temporary weir at Sol Duc built with rock bags — photo 2
Washington DFW temporary weir at Sol Duc built with rock bags — photo 3
Washington DFW temporary weir at Sol Duc built with rock bags — photo 4
Washington DFW temporary weir at Sol Duc built with rock bags — photo 5

Working on a similar project?

Tell us the site conditions and we'll come back with sizing, lead time, and pricing within one business day.